Phase 1 Outcomes Report, M3E Planning and Infrastructure Study 2021

In recent days, a number of articles have been written about the WSP study. The document obtained from a tender was, however, corrupted. Now a better copy has become available, it will be posted here with all the appendices. The original articles are still relevant, and the link to the corrupted document will be replaced in due course. In the meantime, the documents are available here.

RobertsDay: Molonglo 3 East Planning and Infrastructure Study

The Molonglo 3 East Planning and Infrastructure Study is a combination of engineering (WSP) and urban design (RobertsDay). The content related to cycling is largely found in the reports written by RobertsDay. RobertsDay is facilitating a Movement and Place framework discussion between ACT Transport and ACT Environment on the go. Molonglo 3 East project is about experimentation and innovation. The cycle network is still inconclusive but appears promising.

Molonglo 3 East: topography

The topography of Molonglo 3 East demands a reframing of the way planning is done in the ACT. Best practices that apply to the Molonglo valley are not support by the Estate Development Code, Single and Multi-Unit Housing Development Codes and the zoning codes in the Territory Plan. Molonglo 3 East is something new and exciting that will push ACT planing towards an outcomes planning mechanism.

Molonglo 3 East: worth the wait

The Molonglo 3 East Future Urban Area (FUA) will be developed last, likely to be built from west to east. This will mean that the last suburb in the Molonglo Valley will be built within a kilometre from Molonglo Stage 1, where it all started. The irony of this is not lost on those who wish to cycle to Civic, as the most direct route would be through both these suburbs. Still, Molonglo 3 East is shaping up nicely and will be worth the wait.

Bindubi Street / William Hovell Drive: questions

Bindubi St-William Hovell Drive Intersection will change dramatically with the Molonglo 3 East estate development. Bindubi St will be extended into the heart of the Molonglo 3 East. The intersection with William Hovell Drive is expected to be popular with commuters in 2041. A grade separated interchange is planned and the first preliminary sketch plans (PSP) are available. The Feasibility Study Report is attached. Traffic studies show William Hovell Drive will exceed capacity in 2041. Finally, we will need to find space for the light rail. The facilitation of the light rail at the intersection needs to be designed in.

WSP: Molonglo 3 East Planning and Infrastructure Study

The Molonglo 3 East Planning and Infrastructure Study is a combination of engineering (WSP) and urban design (RobertsDay). This article outlines what is in the report for cycling. This article focuses on the reports from WSP.

SMEC: East West Arterial / C10 City to Molonglo Cycleway

The Molonglo Valley has two arterial road corridors, one running east to west and the other north to south. The North South Arterial has been named John Gorton Drive. The East West Arterial (EWA) has yet to be named and expected to be completed before 2041. The East West Arterial includes a bridge over the Molonglo River and a new East West Arterial / Tuggeranong Parkway Interchange. The route is decided and traffic studies are underway.

FOI 21-101215 EPSDD Molonglo Stage 2

The Molonglo Stage 2 Transport Planning related information is from freedom of information request (FOI 21-101215), released 1 April 2021, from EPSDD. Highlighted here are a mix of 18 documents dated from 2010 to 2019 for the suburbs Coombs, Wright, Molonglo and Denman Prospect. The documents fall mostly in the category estate development plans, planning design frameworks, or a development application.

FOI 21-023 2021 Estimates: Belconnen Bikeway

The 2021 Estimates for ACT Transport were held before the Standing Committee On Planning, Transport And City Services on the 4 March 2021. The significance of Freedom of Information request (FOI) 21-023 is that it provides more detail information than the Transcript Of Evidence from the 2021 Estimates. This is a subtle but important difference. The notes include interesting information about Belconnen Bikeway and more.

FOI 21-023 2021 Estimates: community path maintenance

The estimates are part of the ACT Budget process. The estimates are a question and answer, verbal inquiry that provide an opportunity for the opposition and crossbench, to scrutinise the performance of the ACT Government and its directorates. The Freedom of Information (FOI) request 21-023 released the notes for Transport Minister and officials from the directorate.