Belconnen Bikeway during construction

Despite rumours, the Belconnen Bikeway is most definitely not finished and still under construction. The Your guide to cycling in Canberra TCCS map (January 2019) expected the bikeway to be finished. Something went wrong. It was open just before the Christmas 2020. 

Update 6 February 2021 Belconnen Bikeway

The construction along Emu Bank is completed. However, the construction of the section promised at the 2016 ACT Election along Benjamin Way has not yet begun.

Continue reading “Belconnen Bikeway during construction”

CBR Cycle Route wayfinding signage

CBR Cycle Routes are motorways for cyclists, or at least that is the intent. You would know them as you would have ridden on one. Finally, they are getting wayfinding signage. It makes a difference. 🙂

Continue reading “CBR Cycle Route wayfinding signage”

Missing link: filling the gaps in bike networks

Missing links is a term that describes gaps in the cycling network, and those gaps can be quite short. Adding another 100 m of missing path, connecting two other bike paths, makes a network. Without this short link, a cyclist may need to ride a much great distance.

Filling the gap and building a cycling path to form a network does not need to be expensive and it is very worthwhile. The value of fixing the missing link far exceeds the construction costs as it makes the whole path network more attractive to cyclists.

Continue reading “Missing link: filling the gaps in bike networks”