Aranda CBR Cycle Route C5: falling short of expectations

The ongoing saga of Aranda bike path and the lastest email from Tara Cheyne on the topic. Maintenance is sorely needed but despite the newest promises nothing has been done. ACT Labor has never got on top of this issue in their 19 years in government.

Aranda update 13 February 2021

The lower section of the Aranda bike path (C5) has been resurfaced following the 2020 ACT Election but is already cracking due to tree roots. The root cause of the cracking previously was also the trees. This problem is well understood as asphalt reshapes itself to the underlying ground like a glacier. Asphalt is more like plasticine than concrete. The ACT Active Travel Stand Drawings and Austroads recommendations for bike paths provide recommendations for bike path construction to avoid such issues. For roads the asphalt is laid on a thick compacted road base (for John Gorton Drive it has about a 30 cm thickness). The construction of a bike path is similar with a thick “road base” and a relative thin layer of asphalt over that. The “road base” is important as it provides the stability and load bearing that asphalt lacks.

Continue reading “Aranda CBR Cycle Route C5: falling short of expectations”

Kuringa Drive Owen Dixon Drive Intersection Tender

Kuringa Drive has long been a missing link between West Belconnen and West Gungahlin. Building a path along Kuringa Drive was an ACT Labor 2016 Election pledge. The design work is finally completed and gone out to tender. It is not clear when construction will start.

Update 9 April 2021 Kuringa Drive

The work on the upgrade of the Kuringa Drive and Owen Dixon Drive intersection has begun. Expect delays. The works include a bike path along Kuringa Drive. 🙂